Planked Walkway of Scaffold Heavy Duty Ringlock Scaffolding System

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Specifications
Model NO.
SP30
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Cross Ring Scaffolding
Erection Position
External Scaffolding
Move Method
Installed and Fixed
Scaffolding Part Type
Scaffolding Planks
Construction Properties
Building Scaffold
Surface Treatment
Hot DIP Galvanized/Pre-Galvanized
Validity
More Than 20 Years
Thickness
2.75mm/3.2mm
Factory Certificate
ISO9001 ISO4001 ISO45001
Certificate
SGS, Ce
Raw Material
Steel Q355b, Q235B, Q195
Connect Method
Wedge Lock/Ring Lock
Production Capacity
500 Tons/Day
Origin
China
Product Display
Frequently Asked Questions
Q1 Are you a factory or trading company?
We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2 Where is the loading port?
The primary loading ports are Qingdao Port or Tianjin (Xingang) Port.
Q3 What's the MOQ (Minimum Order Quantity) for the products?
Different items have different MOQs. Normally, one full container is preferred for optimal shipping.
Q4 What certificates do you have for quality assurance?
We hold ISO9001, ISO14001, CE, and SGS certifications to ensure high standards.
Q5 How long is the production cycle after placing an order?
Generally, the production cycle is about 15-30 days, depending on the specific quantity requirements.
Q6 Do you provide OEM or ODM services?
Yes, we can provide both OEM and ODM services based on your specific technical requirements.

Related Products