Prefab USP Pharmacy Cleanroom with Pass Box

Customization: Available
After-sales Service: Online Services
Warranty: 3 Years

Product Description

i

Basic Specifications

Modular Cleanroom Overview
Model NO.
Customizable
Style
Customizable
Clean Type
Manual
Usage
Pharmaceutical, Food, Operating Room
Principle
Controlled Environment Maintenance
Fuel
Electric
Certification
CE, UR, ISO
Control
PLC Automation
Panel Material
Color Steel, Stainless Steel
Core Materials
PU/Rock Wool/Glass Magnesium
Wall Width
950mm / 1150mm
Thickness
50mm, 75mm, 100mm

Industry Segmentation Scenarios

Industry Scenario 1
Industry Scenario 2
Industry Scenario 3
Industry Scenario 4
!

Professional Modular Cleanroom Solutions

Established in 2005, our expertise lies in global manufacturing and solution provision for modular cleanroom systems. With nearly 20 years of experience, we deliver reliable, compliant, and cost-efficient cleanroom solutions for industrial, pharmaceutical, and high-tech applications worldwide.

To receive an accurate quotation, please share:
• Industry & application
• Cleanroom size (L × W × H)
• ISO cleanliness class
• Project timeline

We hold over 50 national patents and operate under an ISO 9001:2015 quality management system. Our modular solutions combine structural modularity with smart control systems, energy-saving design, and modern aesthetics. Our systems have been successfully implemented in over 300 enterprises and research institutions across 30 countries.

Facility Image 1
Facility Image 2
Facility Image 3
Technical Drawing 1
Technical Drawing 2
Cleanroom Components
?

Frequently Asked Questions

1. What cleanroom classes do you provide?
We offer cleanrooms from ISO Class 5 to Class 8, including GMP A/B/C/D, tailored to pharmaceutical, medical, and industrial applications.
2. Are your cleanrooms compliant with GMP and ISO standards?
Yes. Our cleanroom solutions are designed in full compliance with ISO 14644, GMP, FDA, and EU GMP requirements.
3. Can you provide customized cleanroom designs?
Absolutely. Our engineering team provides customized layouts and HVAC designs based on your specific process flow, equipment, and capacity needs.
4. How long does cleanroom installation take?
Thanks to our modular system, installation typically takes 2–6 weeks, which is significantly shorter than traditional construction methods.
5. Can the cleanroom be expanded in the future?
Yes. Our modular structure allows for easy expansion, relocation, or upgrading, which helps in reducing future investment risks.
6. How is the environmental control managed?
We use professionally engineered HVAC systems with HEPA filtration, ensuring stable control of temperature, humidity, pressure, and cleanliness levels.

Related Products