GMP Certified Biopharma Cleanroom for Drug Manufacturing

Customization: Available
After-sales Service: Online Services
Warranty: 3 Years

Product Description

Basic Specifications

Model NO.
Customizable
Style
Customizable
Clean Type
Manual
Usage
Pharmaceutical, Food Industry, Cleanroom, Operating Room
Principle
Controlled Environment Maintenance
Fuel
Electric
Certification
CE, UR, ISO
Control
PLC
Automation
Automatic
Condition
New
Panel Material
Color Steel, Stainless Steel
Core Materials
PU/Rock Wool/Glass Magnesium
Standard Thickness
50mm, 75mm, 100mm
Biopharma Cleanroom

Industry Segmentation Scenarios

Scenario 1
Scenario 2 Scenario 3
Scenario 4 Scenario 5

Cleanroom Solutions

Solution

To receive an accurate quotation, please share:

  • Industry & application
  • Cleanroom size (L × W × H)
  • ISO cleanliness class
  • Project country & timeline
Get a Free Solution
Facility 1 Facility 2 Facility 3

Established in 2005, we are a global manufacturer and solution provider specializing in modular cleanroom systems and cleanroom equipment. With nearly 20+ years of experience, we deliver reliable, compliant, and cost-efficient cleanroom solutions for industrial, pharmaceutical, and high-tech applications worldwide.

We hold over 50 national patents and operate under an ISO 9001:2015 quality management system. Our modular cleanroom solutions combine structural modularity with smart control systems, energy-saving design, and modern aesthetics.

Project 1 Project 2
Cleanroom Technical Details

Frequently Asked Questions

What cleanroom classes do you provide?
We offer cleanrooms from ISO Class 5 to Class 8, including GMP A/B/C/D, tailored to pharmaceutical, medical, and industrial applications.
Are your cleanrooms compliant with GMP, FDA, and ISO standards?
Yes. Our cleanroom solutions are designed in full compliance with ISO 14644, GMP, FDA, and EU GMP requirements.
Can you provide customized cleanroom design based on our process?
Absolutely. Our in-house engineering team provides customized layout and HVAC design based on your process flow, equipment, and capacity needs.
How long does cleanroom installation take?
Thanks to our modular cleanroom system, installation typically takes 2–6 weeks, significantly shorter than traditional construction.
Can the cleanroom be expanded or modified in the future?
Yes. Our modular structure allows for easy expansion, relocation, or upgrading, reducing future investment risks.
How do you control temperature, humidity, and air cleanliness?
We use a professionally engineered HVAC system with HEPA filtration, ensuring stable control of temperature, humidity, pressure, and cleanliness levels.

Related Products