Prefabricated components arrive ready for installation. The process follows a logical sequence: steel columns and bracing first, followed by roof beams, horizontal bracing, and finally purlins and enclosure structures.
Lightweight design reduces foundation costs. Fast construction allows for quicker production starts, offering superior economic benefits compared to traditional concrete structures.
With all components factory-processed, site assembly is rapid. A 4,000 square meter building can typically be installed in just 40 days.
Utilizes energy-saving corrugated color steel sheets and sandwich panels. Dry construction methods avoid dust and environmental pollution common in concrete projects.
| Component | Material Details |
|---|---|
| Main Steel Frame | H section steel beam and columns, painted or galvanized |
| Secondary Frame | Hot dip galvanized C purlin, steel bracing, tie bar, knee brace, etc. |
| Roof Panel | EPS, Glass fiber, Rock wool, or PU sandwich panel / steel sheet |
| Wall Panel | Sandwich Panel or Corrugated Steel Sheet |
| Tie Rod | Circular Steel Tube |
| Brace | Round Bar |
| Knee Brace | Angle Steel |
| Roof Gutter | Color Steel Sheet |